Skip to content

Interactive map

INTERACTIVE
MAP
We have produced an interactive map showing the proposed Peak Cluster project boundary. For ease of reference, we have organised the project boundary into 10 sections:

You can zoom to specific areas you would like to see or use the address search in the top left of the map. Click on the route to see section-specific information and the relevant segment of the feedback form to submit your views. 

When providing feedback, please be as specific as you can by providing location-specific references such as addresses, postcodes, nearby landmarks and land references where appropriate. 

Any details that provide personal information will be treated as strictly confidential, but this level of detail will enable us to be as accurate as possible in identifying and considering the feedback you have provided. 

Specifically, we are seeking your feedback on:

  • The need for the project
  • The proposed route for the pipeline
  • The location of associated infrastructure along the pipeline route such as AGIs and BVS
  • The location of the Coastal AGI in the Wirral
  • The proposed capture facilities at the cement and lime operator sites in Derbyshire and Staffordshire  
  • General issues or comments on specific geographies concerning the project;
  • Any additional local issues or sensitivities we should be aware of
    How you have found the consultation.

All information about the infrastructure described above can be found by clicking on the relevant links below, or in the project guide.

Find out more and get involved